Projects

Cherokee Indian Hospital Authority

Long Term Care Facility

Client: Robins & Morton

Location: Cherokee, NC

ODS completed work across 150,000 sq ft, installing toilet compartments, cubicle curtains and track systems, wall protection, toilet and bath accessories, fire extinguishers and cabinets, and lockers.

Carilion Roanoke Memorial Hospital

Crystal Spring Tower Expansion & Renovation

Client: Robins & Morton

Location: Roanoke, VA

ODS completed work across 400,000 sq ft, installing toilet compartments, cubicle curtains and track systems, wall protection, fire extinguishers and cabinets, and lockers.

Roper St. Francis Berkeley Hospital Expansion

Client: Rodgers Builders, Inc.

Location: Summerville, SC

ODS completed work across 126,000 sq ft, installing cubicle curtains and track systems, wall protection, and toilet and bath accessories.

Busch Gardens Theme Park

Location: Williamsburg, VA

ISC was contracted to provide hanging scaffolding under the bridge to enable workers to repair and restore the structure. Project was completed on schedule with no injuries.

Nemours Children’s Hospital

Location: Wilmington, DE

ISC installed overhead protection at the entrance to ensure safe access, along with a 65 ft tall stair tower and trash chute. Wood ramps were also built on the roof to allow motorized carts to safely travel over existing piping and access the trash chute platform. All ramps were engineered to support a maximum load capacity of 1,200 lbs.

UVA University Hospital Expansion

General Contractor: Skanska

Location: Charlottesville, VA

ODHS built Class IV-V ICRA containments throughout the hospital for a vertical expansion tie-in and renovations using Starc Systems Real Wall panels.

Bon Secours St. Francis Vertical Expansion & Renovation

General Contractor: Skanska

Location: Richmond, VA

ODHS built Class IV-V ICRA containments throughout the hospital for a vertical expansion tie-in and renovations using Starc Systems Real Wall panels. Completed on time/on budget with no injuries.

Metropolitan Park Phases 6, 7, 8

Sector: Commercial

General Contractor: Clark Construction

Subcontractor: W.E. Bowers, Inc.

Heat tracing for below grade and rooftop HVAC and plumbing piping along with underslab heat loss prevention. Contracted to install 32,000 linear feet of heat trace cable for freeze protection and 16,000 linear feet of heat trace cable for heat loss prevention.

Richmond International Airport Concourse A Expansion

Sector: Transportation Infrastructure

Location: Sandston, Virginia

Contractor: W.M. Schlosser Company

ODHT installed a heat trace system for rooftop HVAC piping systems that included 2,480 linear feet of heat trace and a heat trace control panel.

Medical University of South Carolina

Location: Charleston, SC

Contractor: Robins & Morton

ODF was contracted to perform all penetration firestopping, smoke and acoustical sealants for a 650,000 sq ft hospital.

Astra Zeneca

Location: Rockville, MD

Contractor: CRB Builders

Installed firestopping systems for through-penetration conditions, including large floor openings for duct risers and oversized wall penetrations to accommodate ductwork through rated assemblies for a 110,000 sq ft manufacturing facility.

Southside Regional Medical Center

Location: Petersburg, VA

Contractor: Atlantic Contractors

Drillcore drilled 2,800 cores through a six-inch thick wire-mesh pan deck floor, as well as two 20-inch and four 14-inch holes in a reinforced wall. The floor cores ranged from three to 14 inches. DrillCore used two drills and averaged 75 holes per day.

Project Hibs – Wolfspeed

Location: Richmond, VA

Contractor: Gallo Mechanical

ODAD conducted a complete interior gut of a three-story academic building. ODAD performed asbestos abatement of floor tile, mastic, and pipe insulation in addition to the complete gut of the interior of the building and removal of all exterior windows and doors.

MGUH Utility Package

Location: Washington, DC

Contractor: Clark Construction

Insulating 7,300 linear feet of 8-24 inch underground chilled water pipe. This project had a very tight phased schedule that required immediate action and intense coordination between ODI and other contractors on the jobsite as work was released. ODI successfully provided difficult special-order product in a timely manner to keep the project on schedule.